Main Conference Day 2 - 21 November 2019

9:00 am - 9:10 am Opening Address

9:10 am - 9:50 am Executing Robust FLNG Engineering & Project Management from FEED to Operations

Akira Nakashima - YOC Engineering Manager, Coral South FLNG Project, JGC Corporation
·         Introducing current approaches of FLNG EPCIC project execution
·         Findings from existing FLNG projects
·         What is the way forward for the next generation of FLNG projects? 
img

Akira Nakashima

YOC Engineering Manager, Coral South FLNG Project
JGC Corporation

9:50 am - 10:20 am Innovative Turret Mooring Solutions for FLNG

Are turret mooring solutions for FPSO suitable for FLNG application? Cheng Chee Hoon from NOV-APL discusses innovation of STPTM and SSYTM for FLNG application. 


10:20 am - 11:00 am Group Networking & Morning Refreshment Break

11:00 am - 11:40 am Discussing Technical Challenges from FLNG Development through to Start-Up and Commissioning

Andrew Loose - Technical Director - LNG / FLNG, KBR
·         How can we better integrate key FLNG facilities, topsides and hull?
·         Ensuring FLNG performance and safety in offshore conditions: What are the foreseeable issues and solutions?
·         Continuously applying risk assessments prior and during the project phases to ensure quality
img

Andrew Loose

Technical Director - LNG / FLNG
KBR

11:40 am - 12:20 pm Developing Standardised Small-Scale FLNGs to Monetise Stranded Gas Resources

Daein Cha - Managing Director, Transborders Energy
  • Reviewing the economics and value proposition of utilising small-scale FLNGs to develop offshore gas resources
  • Exploring innovative FLNG financing and commercial agreements between LNG buyer and resource owner
  • Accelerating FLNG project development lifecycle through standardisation: Where and how? 
img

Daein Cha

Managing Director
Transborders Energy

12:20 pm - 1:00 pm Technical Breakthroughs in Optimising Nearshore FLNG Hull Design

Junghoon Lee - Head of Hull Structure Design , FLNG FEED Department, Hyundai Heavy Industries
  • Overview of Hyundai Heavy Industries’ experiences in FLNG engineering and construction
  • Key elements to consider including operating environment, weight control and impact of vessel motions
  • Challenges faced on FLNG hull design and build and lessons 
img

Junghoon Lee

Head of Hull Structure Design , FLNG FEED Department
Hyundai Heavy Industries

1:00 pm - 2:00 pm Networking lunch

How does this work?
Delegates will be free to choose a roundtable topic of their choice. Each table will last 40-minutes followed by a summary of the key takeaways. This format is highly interactive and will allow participants to share, discuss and exchange best practices from their experiences. 

FLNG Interactive Roundtable Discussion Groups

How does this work?
Delegates will be free to choose a roundtable topic of their choice. Each table will last 40-minutes followed by a summary of the key takeaways. This format is highly interactive and will allow participants to share, discuss and exchange best practices from their experiences. 

FLNG Interactive Roundtable Discussion Groups

2:00 pm - 3:20 pm Roundtable A: Evaluating Optimal FLNG Financing Models
Mr Sidat Senanayake - Director - Energy, ING Bank Asia

img

Mr Sidat Senanayake

Director - Energy
ING Bank Asia

2:00 pm - 3:20 pm Roundtable B: Minimising FLNG Engineering Disparities from Pre-FEED, FEED to FID
Andrew Loose - Technical Director - LNG / FLNG, KBR

img

Andrew Loose

Technical Director - LNG / FLNG
KBR

2:00 pm - 3:20 pm Roundtable C: Enhancing Reliability, Performance and Safety in Offshore Liquefaction

2:00 pm - 3:20 pm Roundtable D: Evaluating FLNG Operational Challenges and Risks

3:20 pm - 3:50 pm Afternoon Tea & Networking Break

3:50 pm - 4:30 pm Advancing Engineering in FLNG for Lower Development Costs and On-Time Delivery

Paul McConnell - FLNG Director, Wison Offshore & Marine
  • What are the distinct engineering advantages and challenges in FLNG development?
  • How to optimise FLNG topsides design and layout
  • FLNG design standardisation (chasing the unicorn)
  • FLNG turnkey solutions build and operate 
img

Paul McConnell

FLNG Director
Wison Offshore & Marine

4:30 pm - 5:10 pm Navigating Technical and Execution Challenges in FLNG Topsides Design to Ensure Operational Safety

Ken Kobayashi - Principal Engineer, Technical HSE Department, Process Technology Division, JGC Corporation
·         Executing a risk-based approach to designing topsides in project execution
·         Evaluating and addressing the risks associated with topsides space constraints, weight limitations and layout
·         How to counter offshore operational complexities and increase overall FLNG safety
img

Ken Kobayashi

Principal Engineer, Technical HSE Department, Process Technology Division
JGC Corporation

5:10 pm - 5:10 pm Closing address